Key ongoing project

1) Engineering, Procurement, Construction, Installation, and Commissioning (EPCIC) of a 40" 303.4km main line and 24" x 15km Spur line of AKK Gas Pipeline Project

CLIENT & LOCATION

Nigerian National Petroleum Corporation (NNPC) Ajaokuta – Kaduna – Kano

WORK SCOPE:

Linear Sections with main sections, Special zones and encroachments and crossings

  • Pipeline Stations with Block Valve, Pigging, Metering, and terminal Gas stations
  • Ancillary installations such as temporary site facilities, temporary site utilities, temporary security measures/installations, and services
  • SCADA and Telecommunication systems for the entire AKK section.

2) Engineering, Procurement and Construction (EPC) of ASSA Gas Pipeline (12" x 28km)

CLIENT & LOCATION

Shell Petroleum Development Company (SPDC) Imo to Rivers State

WORK SCOPE:

Verification of the Front-End Engineering Design (FEED) package

  • Detail Engineering Design of the Pipelines
  • Procurement of 12’’ x 28km 3 LPE coated carbon steel line pipes, induction bends, valves and other long lead items.
  • Construction of 12inch x 28km 3LPE Carbon steel multipurpose pipeline extending from the ANG project
  • Concrete weight coating for buoyancy control of 2.5km section
  • Installation of 12inch x 16inch pig launcher and 12inch x16 inch pig receiver inclusive of ancillary piping
  • Installation of 8inch x 1 km produced water/condensate evacuation Pipeline
  • Creek and waterways crossing, River crossings, Pipeline crossings and road crossings.
  • Baseline intelligent pigging, coating survey and cathodic protection survey
  • Design and installation of citadel fencing
  • Design and Construction of a 16’’ x 1km bypass line
  • Design, Procurement and Construction of a 10’’ x 500m condensate evacuation bypass line

3) Provision of Pipeline Security and Maintenance Services

CLIENT & LOCATION

Nigerian Gas Company (NGC) Atlas Cove-Mosimi-Ibadan Segment

WORK SCOPE:

  • Provision of all required security personnel
  • Provision of all required pipeline maintenance personnel and equipment
  • Handling and management of all matters relating to host communities along the pipeline right of way to ensure harmonious relationships and minimize hostilities.

4) EPC of Ajaokuta – Kaduna – Kano (AKK) 40” X 303.4km Natural Gas Pipeline from Ajaokuta TGS to Abuja 24” X 15km Spurline from Abuja TGS to Abuja IPS including above ground facilities

CLIENT & LOCATION

Nigerian National Petroleum Corporation (NNPC) Ajaokuta – Kaduna – Kano

WORK SCOPE:

  • HDD of River Niger – 1.4km X 40”
  • HTB of Major Roads – 11 nos
  • Minor River Crossing – 68+ nos
  • Minor Road Crossing – 234+ nos
  • Block Valve Station (BVS) – 12 nos
  • Laying of Fiber Optic Cable system for 318.4km including termination, Control & Monitoring system.

Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of Class 600 Terminal Gas Station (TGS) at Ajaokuta with the following:

  • Pressure Reduction and Metering System (PRMS) with associated civil works
  • Pig Launcher System
  • Instrumentation and Control Facilities
  • Power and Utilities
  • Water (Portable and Utilities) System
  • Control Building
  • Fire & Gas Detection System
  • Lightening Protection System
  • Fire Hydrant System
  • Cold Vent and Hydrocarbon Liquid Handling System

Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of Class 600 Intermediate Pigging Station (IPS) at Abuja with the following:

  • Pig Launcher and Receiver System for 48” and 24”Pipeline System with associated civil Facilities
  • Instrumentation and Control Facilities
  • Power and Utilities
  • Water (Portable and Utilities) System
  • Fire & Gas Detection System
  • Lightening Protection System
  • Fire Hydrant System
  • Cold Vent and Hydrocarbon Liquid Handling System

Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of Class 600 Terminal Gas Station (TGS) at Abuja with the following:

  • Pressure Reduction and Metering System (PRMS) with associated civil works
  • Pig Receiver System
  • Instrumentation and Control Facilities
  • Power and Utilities
  • Water (Portable and Utilities) System
  • Control Building
  • Fire & Gas Detection System
  • Lightening Protection System
  • Fire Hydrant System
  • Cold Vent and Hydrocarbon Liquid Handling System

Engineering, Procurement, Construction and Commissioning (EPCC) of 24” X 15km Class 600 pipeline system from Abuja IPS to TGS and associated Tie-Ins.

  • Pre-Commissioning and Commissioning of Pipeline and Above Ground Installation Systems
  • Training of NGPTC Maintenance and Operations Personnel both at the site and vendor’s works
  • Provision of As-Built drawings /Documentation and Operations & Maintenance Manual

5) ASSA North-Ohaji South CPF to OB3 CTMS Gas Pipeline Project

CLIENT & LOCATION

Nigerian National Petroleum Corporation (NNPC)

WORK SCOPE:

The project is an Engineering, Procurement and Construction (EPC) of 36” diameter X 23.3km gas pipeline system from Assa North-Ohaji South CPF to OB3 CTMS with the following features:

  • HDD of Orashi River -1nos
  • Horizontal Thrust-Boring of Major Roads – 5 nos
  • Minor River Crossing -2 nos
  • Minor Road Crossing – 2 nos
  • Pig launcher station at ANOH CPF-1nos
  • Pig receiver station at OB 3 CTMS -1nos
  • Detailed Engineering of Pipeline and End Facilities
  • Pre-Commissioning and Commissioning of Pipeline and Above Ground Installation Systems
  • Operations and Maintenance Assistance for NNPC/SEPLAT Maintenance and Operations Personnel at site
  • Provision of As-Built drawings /Documentations and Operations & Maintenance Manual